Exxon Research Facility

Approximate Value $50,000 –  Design & Build – The Exxon Research Facility’s testing chamber would not hold temperature and experienced multiple compressor failures. Service Refrigeration corrected refrigeration piping, added a suction accumulator vessel with high level switches to protect the…

Placeholder

Whole Foods Markets

Approximate Value $700,000 – Plan & Spec – Service Refrigeration installed a complete refrigeration system utilizing (4) 200 HP screw rack systems and complete CPC computer system for the company’s headquarters in Austin, Texas.

Placeholder

Amigo’s Meat Distribution

Phase 2, Approximate Value $2.1 Million – Design & Build 13,000 sq. ft. Freezer/Cooler Expansion –  Designed and installed a 13,000 sq. ft. Freezer/Cooler expansion for a meat distribution warehouse. Our installation included underfloor heated slab and 6-inch concrete finish…

Placeholder

Baker Petrolite

Approximate Value $225,000 – Design & Build Equipment and Piping Retrofit for Houston Area Plant – The customer requested a custom refrigeration package to be placed in a highly corrosive environment. All the piping and control valves had to be…

Placeholder

Goya Foods

Approximate Value $1.3 Million – Design & Build Refrigerated Warehouse – Designed and installed a 17,000 sq. ft. refrigerated warehouse consisting of an underfloor ventilation system, 6″ black iron suction line piping, Hansen valves, Krack unit coolers, and 28’ tall…